About 30,200 results
Open links in new tab
  1. Non uniform flow occurs when | Civil4M

    Jan 21, 2018 · Non uniform flow occurs when (a) the direction and magnitude of the velocity at all points are identical (b) the velocity of successive fluid par-ticles, at any point, is the same at …

  2. A streamline is defined as the line | Civil4M

    Jan 21, 2018 · A streamline is defined as the line (a) parallel to central axis flow (b) parallel to outer surface of pipe (c) of equal yelocity in a flow (d) along which the pressure drop is uniform …

  3. A one dimensional flow is one which - Civil4M

    Jan 21, 2018 · A one dimensional flow is one which (a) is uniform flow (b) is steady uniform flow (c) takes place in straight lines (d) involves zero transverse component of flow (e) takes place …

  4. What is AAC (Autoclaved Aerated Concrete)? | Civil4M

    Feb 27, 2025 · Full Form of AAC is Autoclaved Aerated Concrete as per data Obtained from Online. In India production of AAC block started in 1972. AAC Blocks is a unique and excellent …

  5. Normal depth in open channel flow is the depth of flow …

    Jan 21, 2018 · Normal depth in open channel flow is the depth of flow corresponding to (a) steady flow (b) unsteady flow (c) laminar flow (d) uniform flow (e) critical flow. The correct Answer Is …

  6. Capital recovery factor considers - | Civil4M

    Jan 18, 2018 · Capital recovery factor considers - (a) developing a predetermined sum at a future data at a uniform rate (b) consuming a predetermined sum till a future date at a uniform rate …

  7. Types of bricks for construction as per IS 1077 | Civil4M

    Sep 9, 2017 · Types of bricks for construction as per IS 1077 First class bricks Those bricks are well burnt, having smooth and even surface, with perfect rectangular shape and uniform …

  8. Manufacturing to placing of concrete - Civil4M

    Aug 25, 2025 · To produce concrete of uniform quality, the ingredients must be measured accurately for each batch. Volume batching Weight batching Volume batching This method is …

  9. What are the limitations of Rational Method in calculating runoff

    Aug 11, 2020 · What are the limitations of Rational Method in calculating runoff? Answer: Computation of runoff is a complicated matter which depends on many factors like the ground …

  10. In Resource Leveling - Civil4M

    Jan 18, 2018 · In Resource Leveling - (a) Total duration Of Project is Reduced (b) Total duration Of Project is Increased (c) Uniform Demand of Resources is achieved (d) Cost of Project is …